WW showed the
presentation
of the Workpackage Description, prepared for the the LINAC4 workpackage
holders meeting of Wednesday 18.6. Some comments and suggestions were given
and are added to the presentation.
MH requested confirmation about the offset installation of the BI.DIS magnets in order to optimize the aperture. Initially a 5 mm offset was proposed, but after discussion it was decided that maximum aperture should be created at the region where the full beam will pas and therefore the BI.DIS magnets should be installed without any offset.