Meeting on Linac4 - PSB BI Line, 20-April-2009
Present:
Excused:
- Feedback from last meeting:
- WW communicated that a meeting to discuss the issues related to the head and tail dump
has taken place on the 19th March 2009 and the minutes can be found
here.
The following possibilities have been discussed and will be studied for
a follow-up meeting mid May:
- Chopping as many bunches as possible with the present 3 MeV
chopper driver design to reduce the load on the dumps.
- Chop beam pulses longer than the present 1 us (20 us would be
optimum) of be reduced (head dump) or removed (tail dump) with an
upgraded design of the pre-chopper and/or the 3 MeV chopper
- In case loading cannot be reduced to a satisfying level,
alternative layouts with external dumps could be envisaged.
- Status outstanding issues:
- H- Injection geometry (BG)
- Optics perturbations (CC)
- Stripping foil specification (WW, BG)
- Modified specifications for warm
BI magnets (DVT40, DVT50, DVT70, Etc.)
- A.O.B.
WW