Meetings on Linac4 - PSB BI Line
Minutes
Presentations
Older Meetings
23-November-2009
BISMV VF 3d analyse
(BB),
Status BIDIS Magnet Construction
(MH),
BS Vacuum Variants
(
WW)
08-February-2010
draft specification of H0/H- dump
(WW)
15-February-2010
Design Values for BI.SMV
(WW),
BI.SMV Progress
(MH),
Dump impact on BS4 field
(BB-JB)
22-February-2010
Measurement of beam current at PSB H0
(BG),
Dump impact on BS4 field
(BB-JB)
Thermal simulations H0 dump
(RC)
1-March-2010
BS4 field distortion due to dump
(BB-JB)
8-March-2010
residual field depending dump conductivity
(BB)
22-March-2010
Remarks on specification
H
0-dump
a
nd specification current monitor
(WW),
Beam current measurement at the PSB injection
(FC),
Beam size at DIS and SMV
(ME)
Further Meetings
Reporting continues via TE/ABT Group pages
List of Outstanding Issues
Parameter List
Conceptual Design