Brennan Goddard; Klaus Hanke; Tony Fowler; Jan Borburgh; Giulia Bellodi; Frank Gerigk; Luc Sermeus; Bettina Mikulec; Wim Weterings.
- BG reported on the status of the simulation studies of the H- Injection and stripping foil (ppt file). It was discussed if vertical painting will be necessary, this will be studied by BG. Possible restriction could be the available space.
- The status of the action list was discussed:
ACTIONS LIST:
Name | Action | Results |
BG, GB | Optics Matching at Injection point | Still ongoing |
KH | Beam offset at BI.DIS | 5.2mm baseline solution, as in TDR |
WW, JB, TF, LS | cost / time estimate backwards compatible system | estimates |
BG | Fall time specification KSW | Presentation |
? | Fringe field specification | |
FG | duration or elimination of the head and tail | Timing estimates |
BG | Possibility of vertical painting | |
ALL | AB-BT note on LINAC4 | Proposed layout (deadline - may 2007) |
GB | Collimation of injected beam before BI.DIS |