Meeting on Linac4 - PSB BI Line, 12-March-2007 - DRAFT

Brennan Goddard; Tony Fowler; Jan Borburgh; Wim Weterings.

- The status of the action list was discussed:

ACTIONS LIST:

Name Action Results
BG, GB Optics Matching at Injection point Still ongoing
KH Beam offset at BI.DIS 5.2mm baseline solution, as in TDR
WW, JB, TF, LS cost / time estimate backwards compatible system estimates
BG Fall time specification KSW Presentation
? Fringe field specification  
FG duration or elimination of the head and tail Timing estimates
BG Possibility of vertical painting  
ALL AB-BT note on LINAC4 Proposed layout (deadline - may 2007)
GB Collimation of injected beam before BI.DIS  
WW Foil Heating Simulations CNGS_2μm foil, CNGS_5μm foil, CNGS_2μm foil_4_pulses
  PSB BI Functional Specification  
WW Physical Apertures of equipment Table of BT equipment
BG Tracking of beam in case of BI.DIS failure  
  Effect Longitudinal painting on transverse painting scheme  
  Possibility of reducing length of KSW1L1  

   

WW