Meeting on Linac4 - PSB BI Line, 18-December-2006

Brennan Goddard; Klaus Hanke; Tony Fowler; Jan Borburgh; Giulia Bellodi; Frank Gerigk; Luc Sermeus; Bettina Mikulec; Wim Weterings.

- BG reported on the status of the simulation studies of the H- Injection and stripping foil (ppt file). It was discussed if vertical painting will be necessary, this will be studied by BG. Possible restriction could be the available space.

- The status of the action list was discussed:

ACTIONS LIST:

Name Action Results
BG, GB Optics Matching at Injection point Still ongoing
KH Beam offset at BI.DIS 5.2mm baseline solution, as in TDR
WW, JB, TF, LS cost / time estimate backwards compatible system estimates
BG Fall time specification  KSW Presentation
? Fringe field specification  
FG duration or elimination of the head and tail Timing estimates
BG Possibility of vertical painting  
ALL AB-BT note on LINAC4 Proposed layout (deadline - may 2007)
GB Collimation of injected beam before BI.DIS  

WW