Brennan Goddard; Tony Fowler; Jan Borburgh; Wim Weterings.
- The status of the action list was discussed:
ACTIONS LIST:
Name | Action | Results |
BG, GB | Optics Matching at Injection point | Still ongoing |
KH | Beam offset at BI.DIS | 5.2mm baseline solution, as in TDR |
WW, JB, TF, LS | cost / time estimate backwards compatible system | estimates |
BG | Fall time specification KSW | Presentation |
? | Fringe field specification | |
FG | duration or elimination of the head and tail | Timing estimates |
BG | Possibility of vertical painting | |
ALL | AB-BT note on LINAC4 | Proposed layout (deadline - may 2007) |
GB | Collimation of injected beam before BI.DIS | |
WW | Foil Heating Simulations | CNGS_2μm foil, CNGS_5μm foil, CNGS_2μm foil_4_pulses |
PSB BI Functional Specification | ||
WW | Physical Apertures of equipment | Table of BT equipment |
BG | Tracking of beam in case of BI.DIS failure | |
Effect Longitudinal painting on transverse painting scheme | ||
Possibility of reducing length of KSW1L1 |