- The status of the action list was discussed:

Closed Issues:

Name Action Results
KH Beam offset at BI.DIS 5.2mm baseline solution, as in TDR
WW, JB, TF, LS cost / time estimate backwards compatible system estimates
BG Fall time specification KSW Presentation
FG duration or elimination of the head and tail Timing estimates

Open Issues:

Name Action Results
BG, GB Optics Matching at Injection point Still ongoing
? Fringe field specification  
BG Possibility of vertical painting  
ALL AB-BT note on LINAC4 Proposed layout (deadline - may 2007)
GB Collimation of injected beam before BI.DIS  
WW Foil Heating Simulations CNGS_2μm foil, CNGS_5μm foil, CNGS_2μm foil_4_pulses
All PSB BI Functional Specification  
WW Physical Apertures of equipment Table of BT equipment
BG Tracking of beam in case of BI.DIS failure  
  Effect Longitudinal painting on transverse painting scheme.  
TF Possibility of reducing length of KSW1L1  
  Investigate the possibility of inversing BS1 and KSW1L1 position as well as BS4 and H0 dump.  
WW Detailed layout of Injection Region PSBLayout
KH, BM Beam Instrumentation requirements in BI region  

WW