Giulia Bellodi; Jan Borburgh; Christian Carli; Brennan Goddard; Frank Gerigk; Klaus Hanke; Bettina Mikulec; Luc Sermeus; Wim Weterings
- The status of the action list was discussed:
Closed Issues:
Name | Action | Results |
KH | Beam offset at BI.DIS | 5.2mm baseline solution, as in TDR |
WW, JB, TF, LS | cost / time estimate backwards compatible system | estimates |
BG | Fall time specification KSW | Presentation |
FG | duration or elimination of the head and tail | Timing estimates |
Open Issues:
Name | Action | Results |
BG, GB | Optics Matching at Injection point | Still ongoing |
? | Fringe field specification | |
BG | Possibility of vertical painting | |
ALL | AB-BT note on LINAC4 | Proposed layout (deadline - may 2007) |
GB | Collimation of injected beam before BI.DIS | |
WW | Foil Heating Simulations | CNGS_2μm foil, CNGS_5μm foil, CNGS_2μm foil_4_pulses |
All | PSB BI Functional Specification | |
WW | Physical Apertures of equipment | Table of BT equipment |
BG | Tracking of beam in case of BI.DIS failure | |
Effect Longitudinal painting on transverse painting scheme. | ||
TF | Possibility of reducing length of KSW1L1 | |
Investigate the possibility of inversing BS1 and KSW1L1 position as well as BS4 and H0 dump. | ||
WW | Detailed layout of Injection Region | PSBLayout |
KH, BM | Beam Instrumentation requirements in BI region |